MRU-120HD

MRU-120HD

  • 3-pole and 4-wire method – measurement of earthing systems using auxiliary probes
  • 3-pole method with clamp – measurement of earthing systems with multiple earth electrodes
  • Two-clamp method – measurement of earthing system when the auxiliary probes cannot be used
  • Resistance of earth and compensatory conductors measured using current ≥200 mA with auto-zero function – meets the requirements of EN 61557-4
MRU-11

MRU-11

  • 3-pole and 4-wire method – measurement of earthing systems using auxiliary probes
  • 2-pole method
  • Earth resistivity – Wenner method
  • resistance of auxiliary electrodes RH and RS
  • measurement of interference voltage to 100 V
  • indication of battery state
  • selection of maximum measuring voltage (25 V and 50 V)
  • Auto-OFF function
MRU-10

MRU-10

  • 3-pole method – measurement of earthing systems using auxiliary probes
  • 2-pole method
  • resistance of auxiliary electrodes RH and RS
  • measurement of interference voltage to 100 V
  • indication of battery state
  • selection of maximum measuring voltage (25 V and 50 V)
  • Auto-OFF function
MRU-200-GPS

MRU-200-GPS

  • Impulse method – measurement of lightning protection systems with a measuring impulse ramp of 4/10 μs, 8/20 μs, 10/350 μs
  • 3-pole and 4-wire method – measurement of earthing systems using auxiliary probes
  • 3-pole method with clamp – measurement of earthing systems with multiple earth electrodes
  • Two-clamp method – measurement of earthing system when the auxiliary probes cannot be used
  • Earth resistivity – Wenner method
MRU-200

MRU-200

  • Impulse method – measurement of lightning protection systems with a measuring impulse ramp of 4/10 μs, 8/20 μs, 10/350 μs
  • 3-pole and 4-wire method – measurement of earthing systems using auxiliary probes
  • 3-pole method with clamp – measurement of earthing systems with multiple earth electrodes
  • Two-clamp method – measurement of earthing system when the auxiliary probes cannot be used
  • Earth resistivity – Wenner method
MRU-120

MRU-120

  • 3-pole and 4-wire method – measurement of earthing systems using auxiliary probes
  • 3-pole method with clamp – measurement of earthing systems with multiple earth electrodes
  • Two-clamp method – measurement of earthing system when the auxiliary probes cannot be used
  • Soil resistivity – Wenner method
  • Resistance of earth connection and equipotential bonding measured using current ≥200 mA with auto-zero function
MRU-30

MRU-30

  • 3-pole and 4-wire method – measurement of earthing systems using auxiliary probes
  • 3-pole method with clamp – measurement of earthing systems with multiple earth electrodes
  • Two-clamp method – measurement of earthing system when the auxiliary probes cannot be used
  • Earth resistivity – Wenner method
  • Resistance of earth connection and equipotential bonding measured using current ≥200 mA with auto-zero function
MRU-21

MRU-21

  • 3-wire method – measurement of earthing systems using auxiliary probes
  • 2-wire method – simplified measurement of resistance-to-earth
  • Resistance of earth and compensatory conductors measured using current ≥200 mA with auto-zero function – meets the requirements of EN 61557-4
  • Measurement of resistance of auxiliary electrodes RS and RH
  • Measurement of interference voltage